|
|
|
|
|
|
 |
| SERVICES |
|
|
|
|
Embassy Suites Hotel and Parking Garage
|  |
Construction Cost: $17M
|  |
The post-tensioned flat plate construction for this 17-story parking structure is supported on a 12-inch steel pipe foundation. The framing consists of a one-way post-tensioned slab with post-tensioned beams.
|
 |
|
|